Archive

Our client asked us to carry out thermal simulations to investigate whether the air temperature in a shaft spanning 8 stories in height and having dimensions of 10.90 x 1.85 metres is less than the critical operating temperature of the outdoor units when the 40...

When our client approached us, they needed guidance and advice on how to ensure the fire safety of a site that was intended as an outdoor facility for the storage of waste tyres. Although tyres are designed to absorb heat and as such are not...

MIA wanted to use the opportunity presented by the regulatory requirement for non-SMEs to conduct an energy audit according to energy efficiency regulations LN 196/2014, to identify opportunities for savings on energy costs. In this project, one of the major challenges was to manage the...

One of our clients, a leader in the hospitality and entertainment industry in Malta, was faced with a number of challenges in their project for two new cinema halls below ground level, primary of which was to find adequate space for the HVAC plant. They...

Our client's biggest headache was how to maintain stable indoor air temperatures and safeguard documents and other assets in the archive building of the bank. Also, as a business in the banking and financial sector, our client wanted to lead by example and adopt a...

In addition to entrusting us with the fire safety assessments, and design of mechanical and electrical services, MaritimeMT, the training arm of the Malta Maritime Pilots Cooperative Society, also wanted us to be responsible for technical site supervision and quantity surveying of the mechanical and...

Our clients, one of Malta’s leading multi-disciplinary audit and advisory firms, commissioned us to assess the adequacy of the building services systems and infrastructure vis-à-vis their own business demands for a new site which they were considering to move into as a result of company...